ASME PTC 47.4 PDF
Original price was: $165.00.$112.20Current price is: $112.20.
Power Block of an Integrated Gasification Combined Cycle Power Plant
Description
ASME PTC 47.4 applies to power blocks in gasification, IGCC power, or cogeneration plants. Not applicable to power blocks not associated with IGCC plants.
Object code provide uniform test methods procedures determination thermal performance electrical output integrated gasification combined cycle (igcc) power block. applies plants (power blocks) operate conjunction plant, igcc cogeneration plant. not apply blocks associated plants. applicable block plants, whereas asme ptc 46 conventional cycles. streams corrections cycles normally limited gas liquid hydrocarbon fuel input steam water input. 47.4, measurements needed address multiple heated syngas input, inputs process units, nitrogen air separation extraction emissions tests, operational demonstration reliability tests outside scope code. 47.4 part series comprised five ptcs describe testing plant: 47-2006 plantsptc 47.1-2017 – cryogenic unit plantptc 47.2-2019 47.3 (to released) conditioning 47.4-2015 plant
Please select a variation to view its description.
Please select a variation to view its description.